{"id":2702,"date":"2026-04-03T10:03:00","date_gmt":"2026-04-03T03:03:00","guid":{"rendered":"https:\/\/infratrans.co.th\/?p=2702"},"modified":"2026-05-21T10:14:00","modified_gmt":"2026-05-21T03:14:00","slug":"the-feasibility-study-review-detailed-design-and-environmental-impact-assessment-eia-project-for-intercity-motorway-route-91-mr1-nakhon-pathom-suphan-buri-section-sections-1-and-2-c","status":"publish","type":"post","link":"https:\/\/infratrans.co.th\/?p=2702","title":{"rendered":"The Feasibility Study Review, Detailed Design, and Environmental Impact Assessment (EIA) Project for Intercity Motorway Route 91 (MR1), Nakhon Pathom \u2013 Suphan Buri Section, Sections 1 and 2 (Consulting Engineering Services)"},"content":{"rendered":"\n<p>On April 3, 2026, Mr. Arnon Sakburanapetch, Executive Director of Infratrans Consultant Co., Ltd., co-signed the employment contracts for two projects at the Department of Highways. These projects include the Feasibility Study Review, Detailed Design, and Environmental Impact Assessment (EIA) Project for Intercity Motorway Route 91 (MR1), Nakhon Pathom \u2013 Suphan Buri Section, Section 1 and Section 2 (Consulting Engineering Services)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"753\" src=\"https:\/\/infratrans.co.th\/wp-content\/uploads\/2026\/05\/659852220_1431676468755501_7375958152443887338_n-2-1024x753.jpg\" alt=\"\" class=\"wp-image-2704\" srcset=\"https:\/\/infratrans.co.th\/wp-content\/uploads\/2026\/05\/659852220_1431676468755501_7375958152443887338_n-2-1024x753.jpg 1024w, https:\/\/infratrans.co.th\/wp-content\/uploads\/2026\/05\/659852220_1431676468755501_7375958152443887338_n-2-300x220.jpg 300w, https:\/\/infratrans.co.th\/wp-content\/uploads\/2026\/05\/659852220_1431676468755501_7375958152443887338_n-2-768x564.jpg 768w, https:\/\/infratrans.co.th\/wp-content\/uploads\/2026\/05\/659852220_1431676468755501_7375958152443887338_n-2.jpg 1290w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>On April 3, 2026, Mr. Arnon Sakburanapetch, Executive D&hellip;<\/p>\n","protected":false},"author":2,"featured_media":2705,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[],"class_list":["post-2702","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","category-28","description-off"],"_links":{"self":[{"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/posts\/2702","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2702"}],"version-history":[{"count":1,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/posts\/2702\/revisions"}],"predecessor-version":[{"id":2706,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/posts\/2702\/revisions\/2706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=\/wp\/v2\/media\/2705"}],"wp:attachment":[{"href":"https:\/\/infratrans.co.th\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infratrans.co.th\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}